Hi.
H Vlems wrote:
DECnet phase IV nodes are backwards compatible with phase III.
Yes. But the question here was if phase V will interoperate with phase III. I don't
know the answer to that one, but on the other hand, I don't think anyone around is
running phase III anyway.
There are no restrictions in functionality between phase IV nodes and phase
V as seen by the unpriviledged user. Area routing may be an issue on Alpha,
and of course ncl is more of a pain to remember than ncp ;-)
True, as far as that goes.
However, I am not sure that a phase V node can operate as a phase IV area router.
Someone else pointed out that although DEC claimed that alphas could not be area routers,
that information is incorrect, and you can just tell an Alpha VMS phase IV node to be an
area router, if you want to.
However, DECnet+ is phase V, and all bets are off. :-)
And yes, not only are the NCL commands more difficult to remember (atleast for me), the
node name management is way more difficult as well. Do anyone know how you copy a nodename
database from another machine with DECnet+?
Two questions:
1-May I use area 44?
Sure.
2-Is there a short guide to set up DECnet over IP to connect to HECnet?
Not that I know of. Maybe Mark Wickens have something on hecnet.eu?
My page (
http://www.update.uu.se/~bqt/hecnet.html) only have information about the
bridge.
Johnny
Hans
-----Oorspronkelijk bericht-----
Van: owner-hecnet at Update.UU.SE [mailto:owner-hecnet at Update.UU.SE] Namens
Marc Chametzky
Verzonden: maandag, juni 2010 0:04
Aan: hecnet at Update.UU.SE
Onderwerp: Re: [HECnet] Attaching to hecnet
DECnet-Plus isn't
able to connect, or at least reliably connect to all OS's that can
potentially be on HECnet. I forget what all OS's I was having issues
with, I know one was RSTS/E v10.1, but I want to say it also included
VAX/VMS. Once I *upgraded* my Alpha running OpenVMS to DECnet Phase IV,
all these issues went away. These were things as simple as SET HOST.
It's probably that DECnet-Plus (Phase V) cannot speak with DECnet Phase III (such as
on RSTS/E and TOPS-10/20). That's my guess anyway.
Phase V should be able to communicate with VAX/VMS since that's Phase IV, which is the
gold standard of DECnet, IMHO.
--Marc
Geen virus gevonden in het binnenkomende-bericht.
Gecontroleerd door AVG -
www.avg.com Versie: 9.0.830 / Virusdatabase: 271.1.1/2966 - datum
van uitgifte: 06/27/10
08:35:00